Gallows Corner · Costain

Utilities coordination supporting the refurbishment of the Gallows Corner flyover.

The challenge
Integrating strategic water infrastructure works with construction sequencing in a constrained operational highway environment.

Our support

  • Utility asset and infrastructure interfaces
  • Statutory undertaker and stakeholder engagement
  • Construction programme coordination
  • Utility protection and diversion support

The difference
Supported the management of utility interfaces, improved visibility of infrastructure constraints and helped integrate utility activities into the wider refurbishment programme.

More projects

A12 Road Widening
Infrastructure

A12 Road Widening

Utilities management with Costain, integrating design, programme, commercial requirements and statutory undertakers.

£1.7m

Communications scope removed

HS2 C23 · EKFB
Transportation

HS2 C23 · EKFB

Embedded utilities management, design coordination and programme integration for the EKFB delivery team.

HS2 C23 · ASC Joint Venture
Transportation

HS2 C23 · ASC Joint Venture

Embedded utilities design management and integration within the ASC design delivery team.

No results found.
Loading...