Sizewell C

An embedded utilities team supporting utilities strategy and temporary construction power.

The challenge
Providing resilient construction power while managing generation costs, network connection options and programme dependencies.

Our support

  • Strategic utilities planning and integration
  • Temporary construction power strategy
  • Electrical supply and connection assessment
  • Technical and commercial interface management

The difference
Challenged temporary power assumptions and identified opportunities to reduce reliance on costly generation through better demand planning and network supply options. The cost efficiencies described are potential opportunities.

More projects

A12 Road Widening
Infrastructure

A12 Road Widening

Utilities management with Costain, integrating design, programme, commercial requirements and statutory undertakers.

£1.7m

Communications scope removed

HS2 C23 · EKFB
Transportation

HS2 C23 · EKFB

Embedded utilities management, design coordination and programme integration for the EKFB delivery team.

HS2 C23 · ASC Joint Venture
Transportation

HS2 C23 · ASC Joint Venture

Embedded utilities design management and integration within the ASC design delivery team.

No results found.
Loading...