The challenge
A substantial utilities scope, uncertain asset information and complex land and stakeholder interfaces through DCO development.

Our support

  • Utility scope validation and assurance
  • Programme, design and commercial management
  • Statutory undertaker and land interfaces
  • Advanced works and construction planning

The difference
Removed 3.9km of communications scope, approximately £1.7m, and eliminated a high-pressure gas diversion. A potential £13.9m contestable procurement saving remained an opportunity, rather than a realised saving.

More projects

HS2 C23 · EKFB
Transportation

HS2 C23 · EKFB

Embedded utilities management, design coordination and programme integration for the EKFB delivery team.

HS2 C23 · ASC Joint Venture
Transportation

HS2 C23 · ASC Joint Venture

Embedded utilities design management and integration within the ASC design delivery team.

Thames Water · Developer Services
Water

Thames Water · Developer Services

Embedded delivery expertise through Mott MacDonald across clean-water and wastewater developer schemes.