Anglian Water · Lincolnshire Reservoir

Utilities discovery and early constraints assessment through Mott MacDonald.

The challenge
Understanding existing utility networks and potential interfaces with a proposed reservoir and its associated infrastructure at an early stage.

Our support

  • Utilities discovery and initial assessment
  • Asset records review and ownership identification
  • Infrastructure mapping and constraints assessment
  • Critical asset and potential conflict identification
  • Protection and diversion considerations
  • Further investigation and survey recommendations

The difference
Established an initial evidence base for design and planning, improved visibility of utility risks and identified where further investigation and asset verification would be needed.

More projects

A12 Road Widening
Infrastructure

A12 Road Widening

Utilities management with Costain, integrating design, programme, commercial requirements and statutory undertakers.

£1.7m

Communications scope removed

HS2 C23 · EKFB
Transportation

HS2 C23 · EKFB

Embedded utilities management, design coordination and programme integration for the EKFB delivery team.

HS2 C23 · ASC Joint Venture
Transportation

HS2 C23 · ASC Joint Venture

Embedded utilities design management and integration within the ASC design delivery team.